Workover Rig
Product description:
The series of workover rigs, which the Max.hook load vary from 900kN to 2250 kN,can meet the requirements of workover, service, testing, fishing, testing pumps for oil and gas wells, with reliable performance ,convennient operation and moving, off-road ability, low cost of moving and relocation.
Technical parameters:
Model
|
XJ900 |
XJ1100 |
XJ1350 |
XJ1600 |
XJ1800 |
XJ2250 |
|||
Nominal range of workover
(m) |
Service
depth
|
73mm EU tubing
|
4000 |
5500 |
7000 |
8500 |
|||
Workover
depth
|
73mm Drill pipe
|
3200 |
4500 |
5800 |
7000 |
8000 |
9000 |
||
88.9mm Drill pipe
|
2500 |
3500 |
4500 |
5500 |
6500 |
7500 |
|||
114mm Drill pipe
|
3600 |
4200 |
5000 |
6000 |
|||||
Hook load max.(kN) |
900 |
1125 |
1350 |
1600 |
1800 |
2250 |
|||
Drawworks
|
Type
|
Single/double drum |
|||||||
Power
|
257-300 |
280-400 |
350-450 |
400-500 |
550 |
735 |
|||
Speed
|
5+1R |
||||||||
Brake
|
Band brake/Disc brake/pater-cooled brake |
||||||||
The rope of hoisting system
|
Drilling line number
|
6 |
8 |
||||||
Most line number
|
8 |
10 |
|||||||
The drilling wire rope diameter
|
26(1) |
26(1),29(1 1/8) |
29(1 1/8),32(1 1/4) |
32(1 1/4) |
|||||
The drilling wire rope diameter |
266(10 1/2) |
445(17 1/2),520(20 1/2) |
520(20 1/2),700(27 1/2 ) |
||||||
Derrick |
Derrick type |
Hydraulic lifting type double mast section |
|||||||
Mast height |
29,31 |
29,31,33 |
31,33,35 |
36,38 |
38,39 |
||||
Drill floor height |
1.84.5 |
3,4,4.5 |
4,4.5,5 |
4,5 |
5,6 |
6,7 |
|||
The chassis drive type |
8×8/10×8 |
10×8 |
12×8 |
14×8 |
14×10 |
||||
Top speed |
45 |